First prototype
The Fuse Blew. Then It Blew Again.
We started with the design we’d used for our first two WattLINK
cables, then moved to thicker wire and a higher-rated fuse.
We thought those changes would be enough.
The fuse blew during the first full-power test. We tried again.
Same result. We eventually switched from a plug-in fuse to a
bolt-down fuse. That meant redesigning the holder and revisiting
work we’d already done.
Development pause
We Put the Project on Hold
Another setback on the test bench stopped work on that version.
The engineers had other projects waiting, and a redesigned
connector and fuse holder meant paying for two molds before
anyone bought the first cable. We had to decide whether to keep going.
By then, some customers had already turned down a refund.
I wanted to give them a date, but the cable still needed work.
Connector redesign
Customers Kept Writing. We Went Back to the Bench.
While the project was on hold, people kept asking whether the cable
was still coming. We picked it back up and redesigned the connector.
If you laid the first prototype beside the production cable,
you’d see where that time went. The connector changed. So did
the fuse and the part that holds it in place.
First production run
The First Batch Is in Production
Eleven months after we started, the first production run is
underway. The $10 launch reservation is now open.